成人爽a毛片免费视频,大胆gogo高清在线观看,女的被弄到高潮娇喘喷水视频,香港日本三级亚洲三级

AC source power & DC source power manufacturing factory

Calculating method of alarm current

As we all know, the capacity selection of AC power supply equipment is very important.choosing the right AC power supply is very important for production, manufacturing, testing and R&D!

excessive capacity selection will increase unnecessary property investment; too small capacity selection will affect the normal production, testing and R&D process and even lead to unusable.

therefore, mastering and understanding the calculation of alarm current will clearly know how to choose the capacity of AC power supply equipment. Suitable power supply equipment will make people feel like a tiger!

AC power supply is divided into single-phase power supply and three-phase power supply according to the different output power.therefore, the calculation method of alarm current can also be divided into two kinds: single-phase power supply and three-phase power supply.
the following are introduced separately:

One:Single-phase power supply
Output 0-300V: divided into low and high gear.the alarm current of low-voltage gear is 120 V, and that of high-voltage gear is 240V. capacity (VA)/gear voltage (V)=gear alarm current (A).

Take 5KVA power supply as an example: 5000VA (capacity)/120V (low grade)≈42A; 5000VA/240V (high grade)≈21A.so we get the alarm current: the output of 5KVA power supply is in the range of 0 -150V, the maximum alarm (limit) current is 42A; the output of 5KVA power supply is in the range of 0 -300V, and the maximum alarm (limit) current is 21A.

Output 0-600V, low-grade 240V, high-grade 480V, the same method to get the alarm current of 21/10.5A.
The simple method is that we only need to calculate the low-grade or high-grade alarm current. Another kind of alarm current can be obtained immediately according to the low-grade alarm current = 2 times the high-grade alarm current

Two: Three-phase power supply
The alarm current is a single-phase alarm current, so the three-phase power supply needs capacity/3 to get the single-phase capacity, and then according to the calculation method of the alarm current of the single-phase power supply, the alarm current of the three-phase power supply can be obtained.

Take three-phase 15KVA power supply as an example: 15KVA/3 = 5KVA, 5000VA/120V≈42A (low-grade alarm current), 42A/2 ≈21A (high-grade alarm current).therefore, the alarm current of three-phase 15KVA power supply is 42/21A.

It is not difficult to find that the calculation of alarm current focuses on the unit of capacity is VA, the unit of voltage is V, and the unit of alarm current is A. Therefore, if the known unit of capacity is KVA, the unit of KVA should be converted to VA when calculating the alarm current. 1KVA is 1000VA.
Recommend Products
Online service
Service Hotline
86-769-89616802
86-13602353727

ADMIRE POWER
高清色惰www日本com| 日本道免费精品一区二区| 亚洲成av人片天堂网无码】| 久久se精品一区精品二区| 亚洲18色成人网站www| 国产狂喷潮在线观看| 强行挺进少妇紧窄湿润| 国产XXXX做受视频国语对白 | 亚洲国产成人精品无码区| 婷婷色婷婷开心五月四房播播久久| 极品粉嫩饱满馒头一线天| 久久久久亚洲精品无码蜜桃| 国产三级无码内射在线看| 国产麻豆md传媒视频| 亚洲色欧美在线影院| 国内精品自线一区二区三区| 少妇性饥渴xxxⅹ开放| 被强到爽的邻居人妻完整版| 公天天吃我奶躁我| 野花香日本大全免费观看| 亚洲精品制服丝袜四区| 国产成人午夜电影在线观看| 欧美国产日韩亚洲中文| 成人网站在线观看| 亚洲日韩一区二区三区| 最近的2019中文字幕国语在线 | 成年片免费观看网站免费观看| 激情综合亚洲色婷婷五月| 无码精品人妻一区二区三区98| 最近最好最新的2018中文字幕| 尤物在线精品视频| 变态挤奶水av大片| 4399日本电影完整版在线观看 | 两个人的视频bd免费中文| 国产精品亚洲二区在线看| 国产黄大片在线观看画质优化| 午夜福制92视频| 女人被弄到高潮叫床免| 久天啪天天久久99久孕妇 | 少妇被粗大的猛烈进出| 欧美日韩亚洲中文字幕二区|