成人爽a毛片免费视频,大胆gogo高清在线观看,女的被弄到高潮娇喘喷水视频,香港日本三级亚洲三级

AC source power & DC source power manufacturing factory

Calculating method of alarm current

As we all know, the capacity selection of AC power supply equipment is very important.choosing the right AC power supply is very important for production, manufacturing, testing and R&D!

excessive capacity selection will increase unnecessary property investment; too small capacity selection will affect the normal production, testing and R&D process and even lead to unusable.

therefore, mastering and understanding the calculation of alarm current will clearly know how to choose the capacity of AC power supply equipment. Suitable power supply equipment will make people feel like a tiger!

AC power supply is divided into single-phase power supply and three-phase power supply according to the different output power.therefore, the calculation method of alarm current can also be divided into two kinds: single-phase power supply and three-phase power supply.
the following are introduced separately:

One:Single-phase power supply
Output 0-300V: divided into low and high gear.the alarm current of low-voltage gear is 120 V, and that of high-voltage gear is 240V. capacity (VA)/gear voltage (V)=gear alarm current (A).

Take 5KVA power supply as an example: 5000VA (capacity)/120V (low grade)≈42A; 5000VA/240V (high grade)≈21A.so we get the alarm current: the output of 5KVA power supply is in the range of 0 -150V, the maximum alarm (limit) current is 42A; the output of 5KVA power supply is in the range of 0 -300V, and the maximum alarm (limit) current is 21A.

Output 0-600V, low-grade 240V, high-grade 480V, the same method to get the alarm current of 21/10.5A.
The simple method is that we only need to calculate the low-grade or high-grade alarm current. Another kind of alarm current can be obtained immediately according to the low-grade alarm current = 2 times the high-grade alarm current

Two: Three-phase power supply
The alarm current is a single-phase alarm current, so the three-phase power supply needs capacity/3 to get the single-phase capacity, and then according to the calculation method of the alarm current of the single-phase power supply, the alarm current of the three-phase power supply can be obtained.

Take three-phase 15KVA power supply as an example: 15KVA/3 = 5KVA, 5000VA/120V≈42A (low-grade alarm current), 42A/2 ≈21A (high-grade alarm current).therefore, the alarm current of three-phase 15KVA power supply is 42/21A.

It is not difficult to find that the calculation of alarm current focuses on the unit of capacity is VA, the unit of voltage is V, and the unit of alarm current is A. Therefore, if the known unit of capacity is KVA, the unit of KVA should be converted to VA when calculating the alarm current. 1KVA is 1000VA.
Recommend Products
Online service
Service Hotline
86-769-89616802
86-13602353727

TECHNIC

SERVICES
色依依av在线| 国产欲女高潮正在播放| 欧美xxxxx精品| 美女视频黄频大全视频免费| 亚洲AV无码成人YELLOW| 亚洲国产精品久久久久久久蜜桃| 首页 综合国产 亚洲 丝袜| 五十六十日本老熟妇乱| 国产精品视频白浆免费视频| 无码国内精品久久综合88| 日本高清免费视频www色| 午夜亚洲AⅤ无码高潮片苍井空 | 高清中文字幕| 交换配乱吟粗大sns84o| 老阿姨才是最有味的| 国产又色又爽又黄的网站免费| 亚洲人成网站在线播放小说| 东京热久久综合久久88| 两根黑人粗大噗嗤噗嗤视频| 山东chinese猛一猛gay| 国产孩cao大人xxxx| 亚洲精品无码午夜福利理论片| 香蕉av亚洲精品一区二区 | 特级毛片在线大全免费播放| 亚洲人成无码久久久A片| 99999久久久久久亚洲| 未满十八18禁止免费网站| 亚洲色无码一区二区三区| 2023国产精品一卡2卡三卡4卡| 人人妻人人做人人爽| 国产SUV精品201| 久久99久久99精品免视看动漫 | 精产一二三产区别在哪| 热99re久久精品| 亚洲大尺度无码无码专线| 性欧美videos武则天| 欧美人与性动交α欧美精品| 亚州性无码不卡免费视频| 电影久久久久久| 激情综合色综合啪啪开心| 厨房掀裙子从后面进啪啪|